In July 2016 Carry Cargo arranged for an onsite movement of the gantry pictured below. Due to its size and weight – 30m long x 2.7m wide, 4.86 high and 30 tonnes- an extending low loader trailer had to be deployed. The 2nd phase of the operation will start in August.